Volkswagen required a new dynamic office space to house 300 of
their staff in one location. The project involved the internal
fitout of two floors of high quality office space and a national
training centre on the ground floor of a purpose built facility in
Chullora.
Volkswagen required on time delivery with minimal defects. The
base building was being completed at the same time as ISIS were
working on the fitout, requiring integration and constant
communication with the base build contractor and subcontractors.
ISIS were also charged with integrating customised artwork into the
project to reflect Volkswagen’s history and product offering.