Building blocks for ME Bank’s future success
ME Bank wanted to establish a central base location for their
head office to house all of their Melbourne staff. Moving from the
existing offices in the Westpac building into the Melbourne Central
Tower, ME Bank had several key requirements for ISIS to address
including a tight timeframe, high qaulity fitout and a need for
communications which was integral due to other construction taking
place within the building.
The ISIS team worked hard to achieve the compressed programme
within the challenging environment and was able to deliver a
quality fitout that is now expecting a 5Star Green Star
rating.
Testimonial
We had a very tight time frame, and ISIS did what they needed to in order to deliver the project on time. This included working additional shifts, and generally going above and beyond to ensure the bank’s time frame was met.